A client is in need of an overpass for ongoing maintenance within a flood plane. The cost to build two lies within the labor of its construction. The Animation shows the layering of which it is mounted and made sturdy. Given the material already exists and that the trail intersects a creek twice, the material is cut in half to make two over passes. The P.E3-D’s design is soon tested where it is assured to be safe and projectable.